{"id":579,"date":"2026-09-29T18:02:14","date_gmt":"2026-09-29T18:02:14","guid":{"rendered":"https:\/\/envelopedock.com\/uncategorized\/envelope-supplier-scorecard\/"},"modified":"2026-09-29T18:02:14","modified_gmt":"2026-09-29T18:02:14","slug":"envelope-supplier-scorecard","status":"publish","type":"post","link":"https:\/\/envelopedock.com\/es\/resources\/buying-guides\/envelope-supplier-scorecard\/","title":{"rendered":"Envelope Supplier Scorecard: How Procurement Teams Compare Factories"},"content":{"rendered":"<h2>Introducci\u00f3n<\/h2>\n\n<p>Most guidance on choosing an envelope supplier tells you what to look at. Procurement teams have a different problem: they are looking at several factories at once, and they need to compare them without the comparison collapsing into whichever salesperson wrote the most persuasive email.<\/p>\n\n<p>A scorecard solves that. It fixes the dimensions in advance, fixes how much each one counts, and requires evidence for every score. Two buyers assessing the same factory then reach roughly the same conclusion \u2014 and a team can defend its choice to whoever signs the contract.<\/p>\n\n<p>This guide is the scorecard itself: ten dimensions, a weighting scheme, the evidence to demand for each, and the red lines that disqualify a factory regardless of how well it scores elsewhere. It assumes you have already identified candidate factories; if you are still at the stage of finding them, start with our <a href=\"\/es\/resources\/buying-guides\/how-to-choose-envelope-supplier\/\">how to choose an envelope supplier<\/a> guide, and for sourcing specifically in China, our <a href=\"\/es\/resources\/buying-guides\/how-to-find-envelope-manufacturers-in-china\/\">c\u00f3mo encontrar fabricantes de sobres en China<\/a> article. This one picks up where those leave off.<\/p>\n\n<h2>Why a Scorecard Beats a Checklist<\/h2>\n\n<p>A checklist tells you whether something is present. A scorecard tells you whether it is good enough.<\/p>\n\n<table>\n<tr><th><\/th><th>Checklist<\/th><th>Scorecard<\/th><\/tr>\n<tr><td><strong>Output<\/strong><\/td><td>Present \/ absent<\/td><td>A comparable number<\/td><\/tr>\n<tr><td><strong>Handles trade-offs<\/strong><\/td><td>No<\/td><td>Yes \u2014 via weighting<\/td><\/tr>\n<tr><td><strong>Survives audit<\/strong><\/td><td>Weak<\/td><td>Defensible<\/td><\/tr>\n<tr><td><strong>Works across several factories<\/strong><\/td><td>Awkward<\/td><td>Purpose-built<\/td><\/tr>\n<tr><td><strong>Exposes weak areas<\/strong><\/td><td>Partly<\/td><td>Per dimension<\/td><\/tr>\n<\/table>\n\n<p>The trade-off handling is the reason to bother. One factory may have better price tiers, another better sample consistency. A checklist records both as \"yes\" and leaves you stuck; a scorecard tells you which difference matters more for your order.<\/p>\n\n<table>\n<tr><th>Situaci\u00f3n<\/th><th>What a scorecard adds<\/th><\/tr>\n<tr><td><strong>Three shortlisted factories<\/strong><\/td><td>A ranking you can justify<\/td><\/tr>\n<tr><td><strong>Two quotes, similar price<\/strong><\/td><td>Dimensions that differ<\/td><\/tr>\n<tr><td><strong>Buyer change mid-project<\/strong><\/td><td>Continuity of criteria<\/td><\/tr>\n<tr><td><strong>Repeat sourcing next year<\/strong><\/td><td>A baseline to compare against<\/td><\/tr>\n<\/table>\n\n<h2>The Ten Scoring Dimensions<\/h2>\n\n<p>These cover the decisions that actually affect an envelope order.<\/p>\n\n<table>\n<tr><th>#<\/th><th>Dimensi\u00f3n<\/th><th>Qu\u00e9 mide<\/th><\/tr>\n<tr><td><strong>1<\/strong><\/td><td>Certification and compliance<\/td><td>Documents the factory can produce and you can verify<\/td><\/tr>\n<tr><td><strong>2<\/strong><\/td><td>Production capacity and equipment<\/td><td>What they own and can run in-house<\/td><\/tr>\n<tr><td><strong>3<\/strong><\/td><td>Sample consistency<\/td><td>Whether the first article matches the production run<\/td><\/tr>\n<tr><td><strong>4<\/strong><\/td><td>Colour and registration capability<\/td><td>Spot colour accuracy, print-to-cut alignment<\/td><\/tr>\n<tr><td><strong>5<\/strong><\/td><td>MOQ and price tiers<\/td><td>Minimums and how price steps with volume<\/td><\/tr>\n<tr><td><strong>6<\/strong><\/td><td>Lead time and schedule commitments<\/td><td>Promised dates and the consequences of missing them<\/td><\/tr>\n<tr><td><strong>7<\/strong><\/td><td>Quality control and inspection<\/td><td>What is checked, how, and what is recorded<\/td><\/tr>\n<tr><td><strong>8<\/strong><\/td><td>Packing and logistics<\/td><td>How finished goods are protected and shipped<\/td><\/tr>\n<tr><td><strong>9<\/strong><\/td><td>After-sales and reorder handling<\/td><td>Response to problems; repeat-order process<\/td><\/tr>\n<tr><td><strong>10<\/strong><\/td><td>Communication and responsiveness<\/td><td>Clarity and speed of technical answers<\/td><\/tr>\n<\/table>\n\n<p>Each dimension is scored on the same scale, so the numbers can be totalled.<\/p>\n\n<table>\n<tr><th>Score<\/th><th>Significado<\/th><\/tr>\n<tr><td><strong>5<\/strong><\/td><td>Evidenced and strong<\/td><\/tr>\n<tr><td><strong>4<\/strong><\/td><td>Evidenced and adequate<\/td><\/tr>\n<tr><td><strong>3<\/strong><\/td><td>Claimed but unverified<\/td><\/tr>\n<tr><td><strong>2<\/strong><\/td><td>Vague or incomplete answer<\/td><\/tr>\n<tr><td><strong>1<\/strong><\/td><td>Unable or unwilling to answer<\/td><\/tr>\n<\/table>\n\n<p>The discipline that makes the scorecard work is the difference between 5\/4 and 3: a score above 3 requires evidence, not an assertion.<\/p>\n\n<h2>Weighting the Dimensions<\/h2>\n\n<p>Not every dimension matters equally, and the weighting depends on your order.<\/p>\n\n<table>\n<tr><th>Dimensi\u00f3n<\/th><th>One-off small run<\/th><th>Recurring volume order<\/th><th>Brand-critical mail<\/th><\/tr>\n<tr><td><strong>Certification \/ compliance<\/strong><\/td><td>Medio<\/td><td>Alta<\/td><td>Alta<\/td><\/tr>\n<tr><td><strong>Capacity and equipment<\/strong><\/td><td>Bajo<\/td><td>Alta<\/td><td>Medio<\/td><\/tr>\n<tr><td><strong>Sample consistency<\/strong><\/td><td>Alta<\/td><td>Alta<\/td><td>Alta<\/td><\/tr>\n<tr><td><strong>Colour and registration<\/strong><\/td><td>Medio<\/td><td>Medio<\/td><td>Alta<\/td><\/tr>\n<tr><td><strong>MOQ and price tiers<\/strong><\/td><td>Alta<\/td><td>Alta<\/td><td>Medio<\/td><\/tr>\n<tr><td><strong>Lead time commitments<\/strong><\/td><td>Medio<\/td><td>Alta<\/td><td>Alta<\/td><\/tr>\n<tr><td><strong>Control de calidad<\/strong><\/td><td>Medio<\/td><td>Alta<\/td><td>Alta<\/td><\/tr>\n<tr><td><strong>Packing and logistics<\/strong><\/td><td>Bajo<\/td><td>Medio<\/td><td>Medio<\/td><\/tr>\n<tr><td><strong>After-sales<\/strong><\/td><td>Bajo<\/td><td>Medio<\/td><td>Alta<\/td><\/tr>\n<tr><td><strong>Comunicaci\u00f3n<\/strong><\/td><td>Medio<\/td><td>Alta<\/td><td>Alta<\/td><\/tr>\n<\/table>\n\n<p>A simple weighting scheme is enough \u2014 pick the four or five dimensions that matter most for your order and give them double weight.<\/p>\n\n<table>\n<tr><th>Order profile<\/th><th>Weight double<\/th><\/tr>\n<tr><td><strong>First order, modest volume<\/strong><\/td><td>Sample consistency, MOQ, communication<\/td><\/tr>\n<tr><td><strong>Recurring programme<\/strong><\/td><td>Capacity, lead time, QC, after-sales<\/td><\/tr>\n<tr><td><strong>Colour-critical brand mail<\/strong><\/td><td>Colour capability, sample consistency, QC<\/td><\/tr>\n<\/table>\n\n<p>Weighting before you score is what prevents the common failure of discovering, halfway through, that you are comparing on the wrong axis.<\/p>\n\n<h2>Red Lines: Deal-Breakers Regardless of Score<\/h2>\n\n<p>Some answers end the evaluation on their own.<\/p>\n\n<table>\n<tr><th>Red line<\/th><th>Why it disqualifies<\/th><\/tr>\n<tr><td><strong>No verifiable certification documents<\/strong><\/td><td>Compliance cannot be assumed<\/td><\/tr>\n<tr><td><strong>Refuses a physical sample before production<\/strong><\/td><td>No way to confirm what you will receive<\/td><\/tr>\n<tr><td><strong>Cannot say whether production is in-house<\/strong><\/td><td>Control over schedule and quality is unknown<\/td><\/tr>\n<tr><td><strong>Refuses a written lead-time commitment<\/strong><\/td><td>No recourse if the date slips<\/td><\/tr>\n<tr><td><strong>Se niega a la inspecci\u00f3n de terceros.<\/strong><\/td><td>QC cannot be independently verified<\/td><\/tr>\n<tr><td><strong>Payment terms with no delivery protection<\/strong><\/td><td>Financial exposure is unbounded<\/td><\/tr>\n<tr><td><strong>Cannot explain what happens if goods are off-spec<\/strong><\/td><td>No remedy path<\/td><\/tr>\n<\/table>\n\n<p>Two of these deserve a note. On certification: the requirement is not that a factory holds a particular certificate, but that it can produce documentation you can verify against the issuing body \u2014 an unverifiable claim is worse than an honest \"we do not hold that.\" On inspection: refusal of third-party inspection at your cost is a strong signal, and a factory with a well-run QC process rarely objects.<\/p>\n\n<table>\n<tr><th>Confirm before scoring<\/th><th>Evidence<\/th><\/tr>\n<tr><td><strong>Certification claims<\/strong><\/td><td>Document plus a way to verify it<\/td><\/tr>\n<tr><td><strong>Production location<\/strong><\/td><td>Named facility, not a sales office<\/td><\/tr>\n<tr><td><strong>Sample policy<\/strong><\/td><td>Physical sample offered before the run<\/td><\/tr>\n<tr><td><strong>Inspection policy<\/strong><\/td><td>Third-party inspection accepted<\/td><\/tr>\n<tr><td><strong>Remedy for off-spec goods<\/strong><\/td><td>Stated in writing<\/td><\/tr>\n<\/table>\n\n<h2>Evidence to Require Per Dimension<\/h2>\n\n<p>A score is only as good as the evidence behind it.<\/p>\n\n<table>\n<tr><th>Dimensi\u00f3n<\/th><th>Evidence to request<\/th><\/tr>\n<tr><td><strong>Certification and compliance<\/strong><\/td><td>Copies of certificates with numbers you can check<\/td><\/tr>\n<tr><td><strong>Capacity and equipment<\/strong><\/td><td>Named equipment and facility details<\/td><\/tr>\n<tr><td><strong>Sample consistency<\/strong><\/td><td>A physical sample plus a retention policy<\/td><\/tr>\n<tr><td><strong>Colour and registration<\/strong><\/td><td>Example of a comparable job, ideally in hand<\/td><\/tr>\n<tr><td><strong>MOQ and price tiers<\/strong><\/td><td>Written tier schedule, tooling treatment included<\/td><\/tr>\n<tr><td><strong>Tiempo de entrega<\/strong><\/td><td>Committed dates in writing, with remedies<\/td><\/tr>\n<tr><td><strong>Control de calidad<\/strong><\/td><td>Defined checkpoints and what is recorded<\/td><\/tr>\n<tr><td><strong>Packing and logistics<\/strong><\/td><td>Pack specification, cartons, palletisation<\/td><\/tr>\n<tr><td><strong>After-sales<\/strong><\/td><td>Named contact and process for issues<\/td><\/tr>\n<tr><td><strong>Comunicaci\u00f3n<\/strong><\/td><td>Response to a specific technical question<\/td><\/tr>\n<\/table>\n\n<p>There is one recurring theme: written answers beat verbal ones, and physical evidence beats written ones.<\/p>\n\n<table>\n<tr><th>Evidence tier<\/th><th>Resistencia<\/th><\/tr>\n<tr><td><strong>Physical sample you can inspect<\/strong><\/td><td>Strongest<\/td><\/tr>\n<tr><td><strong>Written specification<\/strong><\/td><td>Fuerte<\/td><\/tr>\n<tr><td><strong>Verbal assurance<\/strong><\/td><td>Weak<\/td><\/tr>\n<tr><td><strong>Marketing material<\/strong><\/td><td>Weakest<\/td><\/tr>\n<\/table>\n\n<h2>Sample Testing Items<\/h2>\n\n<p>The sample is where claims meet reality, so define what you will check before it arrives.<\/p>\n\n<table>\n<tr><th>Verificar<\/th><th>What You Are Looking For<\/th><\/tr>\n<tr><td><strong>Dimensional accuracy<\/strong><\/td><td>Measured against the specification, with tolerance<\/td><\/tr>\n<tr><td><strong>Crease quality<\/strong><\/td><td>Folds cleanly, no cracking along the fold<\/td><\/tr>\n<tr><td><strong>Seam and flap integrity<\/strong><\/td><td>Fully bonded, closes squarely<\/td><\/tr>\n<tr><td><strong>Colour accuracy<\/strong><\/td><td>Against your reference, under consistent light<\/td><\/tr>\n<tr><td><strong>Registro<\/strong><\/td><td>Print position relative to cut and fold<\/td><\/tr>\n<tr><td><strong>Finish consistency<\/strong><\/td><td>Foil or emboss even, not patchy<\/td><\/tr>\n<tr><td><strong>Stock match<\/strong><\/td><td>Weight and feel as specified<\/td><\/tr>\n<tr><td><strong>Contents fit<\/strong><\/td><td>The actual insert fits with clearance<\/td><\/tr>\n<\/table>\n\n<p>Two points are commonly skipped. First, <strong>check the crease on the actual stock<\/strong> \u2014 a fold that behaves on one paper grade can crack on another. Second, <strong>test with the real contents<\/strong>, not a proxy: an envelope that measures correctly can still be unusable if the insert does not slide in.<\/p>\n\n<table>\n<tr><th>Test with<\/th><th>Por qu\u00e9<\/th><\/tr>\n<tr><td><strong>Real insert<\/strong><\/td><td>Catches clearance problems<\/td><\/tr>\n<tr><td><strong>Real volume stack<\/strong><\/td><td>Catches thickness problems<\/td><\/tr>\n<tr><td><strong>Your own equipment<\/strong><\/td><td>Confirms it feeds through insertion<\/td><\/tr>\n<tr><td><strong>Consistent lighting<\/strong><\/td><td>Makes colour judgement meaningful<\/td><\/tr>\n<\/table>\n\n<h2>Capacity and Lead-Time Verification<\/h2>\n\n<p>Capacity and schedule are the two claims most often accepted without question.<\/p>\n\n<table>\n<tr><th>Pregunta<\/th><th>What a good answer looks like<\/th><\/tr>\n<tr><td><strong>What equipment do you run?<\/strong><\/td><td>Named processes, in-house<\/td><\/tr>\n<tr><td><strong>What is your current workload?<\/strong><\/td><td>Candid \u2014 a fully booked factory will slip<\/td><\/tr>\n<tr><td><strong>What is the committed lead time?<\/strong><\/td><td>A specific number of working days<\/td><\/tr>\n<tr><td><strong>What happens if the date slips?<\/strong><\/td><td>A stated remedy<\/td><\/tr>\n<tr><td><strong>Can you hold stock for split delivery?<\/strong><\/td><td>Yes, with terms<\/td><\/tr>\n<\/table>\n\n<p>A factory that answers the workload question honestly is more reassuring than one that promises a fast date to every enquiry.<\/p>\n\n<table>\n<tr><th>Se\u00f1al<\/th><th>Interpretation<\/th><\/tr>\n<tr><td><strong>Specific, qualified dates<\/strong><\/td><td>Understood their own schedule<\/td><\/tr>\n<tr><td><strong>Unqualified fast promises<\/strong><\/td><td>Sales answer, not a production answer<\/td><\/tr>\n<tr><td><strong>Willing to state remedies<\/strong><\/td><td>Takes the commitment seriously<\/td><\/tr>\n<tr><td><strong>Vague on tooling time<\/strong><\/td><td>Likely has not costed a custom size recently<\/td><\/tr>\n<\/table>\n\n<h2>Normalising Quotes Before Scoring<\/h2>\n\n<p>Price cannot be scored until the quotes describe the same thing.<\/p>\n\n<table>\n<tr><th>Verificar<\/th><th>Por qu\u00e9<\/th><\/tr>\n<tr><td><strong>Same envelope size<\/strong><\/td><td>Paper area and yield differ<\/td><\/tr>\n<tr><td><strong>Same paper and weight<\/strong><\/td><td>Material cost differs<\/td><\/tr>\n<tr><td><strong>Same print specification<\/strong><\/td><td>Colour count drives setup<\/td><\/tr>\n<tr><td><strong>Same finishes<\/strong><\/td><td>Each finish is a pass<\/td><\/tr>\n<tr><td><strong>Misma cantidad<\/strong><\/td><td>The dominant price lever<\/td><\/tr>\n<tr><td><strong>Tooling included or separate<\/strong><\/td><td>A one-time charge changes the unit price<\/td><\/tr>\n<tr><td><strong>Packing and freight included<\/strong><\/td><td>Or quoted separately<\/td><\/tr>\n<tr><td><strong>Proofing included<\/strong><\/td><td>Digital proof and physical sample<\/td><\/tr>\n<\/table>\n\n<p>Once the quotes are aligned, price becomes one dimension among ten rather than the whole decision.<\/p>\n\n<table>\n<tr><th>Normalise first<\/th><th>Then compare<\/th><\/tr>\n<tr><td><strong>Especificaci\u00f3n<\/strong><\/td><td>Like for like<\/td><\/tr>\n<tr><td><strong>Inclusions<\/strong><\/td><td>Total, not unit only<\/td><\/tr>\n<tr><td><strong>Tier position<\/strong><\/td><td>Each quote at the same quantity<\/td><\/tr>\n<tr><td><strong>Entonces<\/strong><\/td><td>Score the price dimension<\/td><\/tr>\n<\/table>\n\n<p>For how the underlying cost lines are built up, see our <a href=\"\/es\/custom-manufacturing\/\">fabricaci\u00f3n personalizada<\/a> page and our <a href=\"\/es\/resources\/buying-guides\/envelope-printing-cost\/\">coste de impresi\u00f3n de sobres<\/a> guide; for how volume tiers change the picture, our <a href=\"\/es\/wholesale-bulk\/\">mayoreo y granel<\/a> descripci\u00f3n general m\u00e1s amplia.<\/p>\n\n<h2>Running the Comparison<\/h2>\n\n<p>The scorecard is only useful if it is applied consistently.<\/p>\n\n<table>\n<tr><th>Paso<\/th><th>Acci\u00f3n<\/th><\/tr>\n<tr><td><strong>1<\/strong><\/td><td>Fix the specification you are buying<\/td><\/tr>\n<tr><td><strong>2<\/strong><\/td><td>Set the weights before any scores<\/td><\/tr>\n<tr><td><strong>3<\/strong><\/td><td>Apply red lines first \u2014 disqualify, do not score<\/td><\/tr>\n<tr><td><strong>4<\/strong><\/td><td>Ask every factory the same questions<\/td><\/tr>\n<tr><td><strong>5<\/strong><\/td><td>Score only against evidence<\/td><\/tr>\n<tr><td><strong>6<\/strong><\/td><td>Total, then review the outliers by hand<\/td><\/tr>\n<tr><td><strong>7<\/strong><\/td><td>Award the order with the reasoning recorded<\/td><\/tr>\n<\/table>\n\n<p>The last step matters more than it sounds. A scorecard produces a number; the award decision should record why that number won, so the next buyer understands the reasoning.<\/p>\n\n<table>\n<tr><th>Keep on file<\/th><th>Por qu\u00e9<\/th><\/tr>\n<tr><td><strong>The specification<\/strong><\/td><td>Baseline for reordering<\/td><\/tr>\n<tr><td><strong>The scores and evidence<\/strong><\/td><td>Continuity across buyers<\/td><\/tr>\n<tr><td><strong>The approved sample<\/strong><\/td><td>Reference for the production run<\/td><\/tr>\n<tr><td><strong>The commitment terms<\/strong><\/td><td>Basis for any claim later<\/td><\/tr>\n<\/table>\n\n<h2>Errores comunes<\/h2>\n\n<table>\n<tr><th>Error<\/th><th>Consecuencia<\/th><th>Soluci\u00f3n<\/th><\/tr>\n<tr><td><strong>Scoring price first<\/strong><\/td><td>Other differences get ignored<\/td><td>Normalise, then score price last<\/td><\/tr>\n<tr><td><strong>Weighting after scoring<\/strong><\/td><td>Result engineered to a preferred answer<\/td><td>Set weights before scores<\/td><\/tr>\n<tr><td><strong>Skipping red lines<\/strong><\/td><td>Known-fatal issues still scored<\/td><td>Disqualify, then score<\/td><\/tr>\n<tr><td><strong>Accepting verbal claims<\/strong><\/td><td>Nothing verifiable<\/td><td>Require written evidence<\/td><\/tr>\n<tr><td><strong>Sin muestra f\u00edsica<\/strong><\/td><td>Discovery happens at volume<\/td><td>Sample before committing<\/td><\/tr>\n<tr><td><strong>Different questions to each factory<\/strong><\/td><td>Answers are not comparable<\/td><td>One question set, all factories<\/td><\/tr>\n<tr><td><strong>Forgetting inclusions<\/strong><\/td><td>Cheapest quote is not cheapest<\/td><td>Align specifications first<\/td><\/tr>\n<\/table>\n\n<h2>Conclusi\u00f3n<\/h2>\n\n<p>Un <strong>envelope supplier<\/strong> scorecard turns sourcing from a matter of impressions into a comparison you can defend. Ten dimensions, scored against evidence rather than assertion, weighted according to what your order actually needs, with red lines applied before scoring rather than after.<\/p>\n\n<p>Set the weights first, demand evidence above the \"claimed but unverified\" line, test a physical sample with the real contents, normalise the quotes before you compare price, and record the reasoning behind the award. To find candidates in the first place, start with our guide to choosing an envelope supplier; the production side you are evaluating is described on our custom manufacturing page.<\/p>\n\n<p>Ready to put a factory through the scorecard? <a href=\"\/es\/request-quote\/\">Solicite una cotizaci\u00f3n<\/a> and ask for the specification, sample, and commitments in writing.<\/p>","protected":false},"excerpt":{"rendered":"Introduction Most guidance on choosing an envelope supplier tells you what to look at. Procurement teams have a different problem: they are looking at several factories at once, and they need to compare them without the comparison collapsing into whichever salesperson wrote the most persuasive email. A scorecard solves that. It fixes the dimensions in [&hellip;]","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_metadesc":"An envelope supplier scorecard for procurement teams \u2014 the dimensions to score, how to weight them, and the red lines that disqualify a factory.","footnotes":""},"categories":[7],"tags":[],"class_list":["post-579","post","type-post","status-publish","format-standard","hentry","category-buying-guides"],"_links":{"self":[{"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/posts\/579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/comments?post=579"}],"version-history":[{"count":0,"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/posts\/579\/revisions"}],"wp:attachment":[{"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/media?parent=579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/categories?post=579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/envelopedock.com\/es\/wp-json\/wp\/v2\/tags?post=579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}